Thruway Authority replies to Residents’ Concerns

Trail head of walking/bicycle path and Esposito Trail/K. Wolf

With the new bridge and path set to open sometime in 2018, the South Nyack Tappan Zee Bridge Task Force and village board held a workshop last Tuesday prior to the bi-monthly board meeting. Task force member Don McMahon moderated the meeting aimed at clarifying concerns brought to the Thruway Authority regarding traffic, safety, lighting and maintenance.

Now that the exit ramp at Clinton Avenue and South Franklin Street will become a T-intersection — with one stop sign at the ramp’s end to streamline traffic and lessen the occurrence of motorists who make less-than-full stops — some asked how buses will make the sharp turn. As the design was requested by the village and recommended by the state DOT, project officials will check for additional details.

Conceptual rendering of side path and Esposito Trail/K. Wolf

Speed calming measures for bicyclists will be added to the path, and two sets of spring-loaded gates will be added where the path and the Esposito Trail meet the street. Bicyclists will need to dismount to cross Clinton Avenue; pedestrians will have a signal designed in accordance with federal guidelines.

“We send two guys down the trail to do maintenance,” Superintendent of Public Works James Johnson noted, “so if we have spring-loaded gates that we have to hold open, now three of us have to go down there to do maintenance.”

Emergency vehicles will have access from the parking lot and the Esposito Trail/side path. Physical impediments, such as the bollards at the trailhead on Clinton Street, will be removable.

The path will be maintained by the state, and state police will provide security for the path and facilities. Mayor Bonnie Christian said a future meeting with the village police chief, state police and a representative from Governor Cuomo’s office will discuss security and maintenance.

Parking lot at Rockland terminus; stairs lead to path/K. Wolf

Where will small children ride their bicycles? “My kids ride their bikes on that side, and that’s one of my worries,” Kendol Leader said. Project officials agreed parents may want their children to use the trail.

Both the trail and path will measure 10 feet wide save for the first 150 feet from the trailhead at Clinton Avenue and South Franklin Street, where the side path will be eight feet wide as an additional bicycle speed calming measure.

One person commented about feeling “fenced in” when walking the trail after its redesign; another wanted to know about the new lighting. Fences will range from 42 inches to 72 inches, depending upon location, and final dimensions may change slightly.

“Dark sky lighting is significantly different from lighting we’re all used to,” trustee Catherine McCue explained. “The lighting cast is much softer, and the area it’s cast in is much more contained. It’s significantly softer and easier on the eyes.”

McMahon said it’s his understanding that contracts will be completed by summer, and work will commence by early fall, McMahon said.

I’d like to know what you think.

Copyright © Janie Rosman and Kaleidoscope Eyes 2017

2 comments so far

  1. James on

    Why does pedestrian/cyclist bridge traffic need to connect to the Esposito Trail at all? There’s no need to connect it. Can’t it just go to and from the parking lot area?

    Liked by 1 person

    • nykeypad on

      Hi James, thanks for reading my blog. The walking/bike path terminus was planned for other locations on local streets and was moved to Interchange 10 at the village’s request. When that happened, plans were reconfigured: http://wp.me/p3ncNt-6k0 and http://wp.me/p3ncNt-6Wh

      Like


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: