Archive for April, 2018|Monthly archive page

Logging Miles before the Bridge Path Opens

It was raining by the time I got home last night, the sixth shared use path boot camp mile behind me.

Yes, readers, I’m getting ready for when the path opens next year as I plan to walk across one of the Hudson River’s widest points. The distance will be more than 3.1 miles when you include the Westchester and Rockland landings.

I’ve walked for exercise during the past few years, even when my knee and hip began to groan. The new hip joint, six and one-half weeks old today, helped me walk six miles during the past three days (two miles in one-mile stints every other day). Goal is to work up to two miles at a time, then three miles at a time.

These are in addition to walking for errands, etc. We’re talking pre-SUP training.

While the above photo courtesy of the New York State Thruway Authority is from last November, it’s nice to know the path will be well-lit for those who want to bicycle or walk during shorter days and/or dusk. Hours are to be determined.

I’d like to know what you think.

Copyright © Janie Rosman and Kaleidoscope Eyes 2018

Progress on Thruway & State Police Facilities

The new maintenance facility is progressing rapidly per this photo courtesy of the New York State Thruway Authority. Crews were also pouring concrete for the new state police facility on the south side of the Thruway (webcam photo below).

You and I see lanes of traffic divided by a concrete strip in the photo below. They — the design-build team and others working on this project — see a future walking and bicycle path (right lane) and a breakdown lane (second from right).

Hadn’t planned to walk two miles yesterday. One more mile plus one-tenth, and I’d have crossed the new bridge on foot; add a bit more for the path’s start and end. Planning to walk another mile or two a few times per week.

These outings will put my brand new hip joint to the test and are prep for my eventual goal: to walk across the path. Aced the Lower Hudson Valley Engineering Expo weekend before last.

I’d like to know what you think.

Copyright © Janie Rosman and Kaleidoscope Eyes 2018

Final Steel Assembly & Removing TZB Roadway

Last week (April 12), the super crane placed the final steel girder assembly on the eastbound span. Crews continue placing additional small, unattached girders near Rockland so the span will connect to land.

The I Lift NY has been installing the blue steel assemblies since June 2015. I was there and saw the massive crane lift the first blue steel assembly from the barge that brought it downriver. Very exciting!

Photos are courtesy of the New York State Thruway Authority. Above, a mobile crane removes pieces of the Tappan Zee Bridge’s roadway. As the super crane ceased work on the new bridge, it will remove sections of the TZB’s large steel truss during the coming week; they’ll be placed on barges and eventually recycled.

I’d like to know what you think.

Copyright © Janie Rosman and Kaleidoscope Eyes 2018

LHV Engineering Expo: 15th Annual STEM Event

As the bridge project met and hit timeline markers, your intrepid reporter met one of her own: last Sunday I attended the Lower Hudson Valley Engineering Expo at White Plains High School. Yes, my then four-and-one-half week new hip and I.

The first photo includes a black strand sticking up from the cross-section of stay cable. The photo above shows the top of that section with wires bundled into it.

Everyone wanted to see how heavy the section of 18-gauge galvanized rebar was compared to the residential rebar. I wonder if anyone tried to pick up the section of cement.

There were oyster shells — I put two up to my ear and thought I heard a whoosh although not like the ocean — and furry friends like this fish to show the project was protecting life below the bridge.

Weather not withstanding as spring is hiding somewhere, the day of companies, experiments, college and universities, learning and contests was a success. It was reigning STEM. You’re smiling if you understand the reference, and please pardon the pun if you don’t.

Watch for story about kids’ fascination with —  and how they’re learning about — STEM topics and activities in the May 2018 issue of Westchester Family.

I’d like to know what you think.

Copyright © Janie Rosman and Kaleidoscope Eyes 2018

Flashback Friday: Five Years of Blogging

The night before the new bridge’s westbound span opens: photo courtesy of the New York State Thruway Authority. The eastbound span will open sometime this year; the walking and bicycle path not for another year.

It’s all about the concrete as places precast slabs near the Westchester landing pours concrete for the new state trooper facility . . . and the new maintenance facility gets exterior wall panels and windows.

Learn more at the Lower Hudson Valley Engineering Expo this Sunday, April 15.

I’d like to know what you think.

Copyright © Janie Rosman and Kaleidoscope Eyes 2018

%d bloggers like this: