Thruway Traffic to stop during TZB Demolition

Seen at summer 2018 final TZB historical tour from Haverstraw Bay./© J. Rosman 2018

In response the contractor’s plans to demolish the eastern anchor span of the Tappan Zee Bridge this Saturday via limited use of explosives, the Thruway Authority has planned an extended traffic stop.

State police will close the Thruway at 8:55 a.m. for approximately 45 minutes. It will reopen after TZC determines the area safe for traffic. Metro-North schedules may be “only minimally affected,” per a press release by contractor Tappan Zee Constructors, LLC (TZC). Rain/snow date is Sunday.

Spring after the project started: “Figure Sitting at RiverWalk Park”/© J. Rosman 2013

Important to note the operation is Saturday (or Sunday) and that traffic will be stopped in both directions. I hope people realize this.Additionally, these entrance ramps will be closed at approximately 9 a.m.

In Westchester: Exit 9 (Tarrytown – Sleepy Hollow – Route 9), Route 119 in Elmsford and the Saw Mill Parkway (Exit 22)

and in Rockland: Exit 10 (Nyack – South Nyack – US Route 9W) and Exit 11 in Nyack (Nyack – South Nyack – US Route 9W).

Plan accordingly if you need to cross the river in either direction that morning.

I’d like to know what you think.

Copyright © Janie Rosman and Kaleidoscope Eyes 2019

No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: